Notified Security Rates (Advance Consumption Deposit)

Sr. No. Category Rates per KW or part thereof (Rs.)
1. Domestic Supply 200
2. Non-Residential Supply 500
3. Small Power Supply 300
4. Medium Supply 500
5. Large Supply 1500
6. Bulk Supply 800
7. Public Lighting 750
8. Agricultural Supply 120




Notified Security for Metering equipment, if meter is supplied by the Deptt.

Sr. No. Category Rates per meter (metering equipment)(Rs.)
1. Single Phase Energy Meter(LT Supply) 250
2. Three Phase Energy Meter without CTs (LT Supply)
(i)   For general supply
(ii)   For Industrial/Agricultural supply load upto 20KW

500
500
3. Three phase energy meters with C.T.s (LT Supply):
(i)  For General supply with electronic meter
(ii)  For Industrial supply load exceeding 20 KW and upto 100KW
(iii)  For Industrial supply load exceeding 20 KW and upto 100 KW with electronicx meter

1000
1000
12,000
4. Metering equipment with CTs/PTs (HT Supply) 60,000


ELECTRICITY DEPARTMENT || ABOUT US || CONTACT US || NEW CONNECTION FORMALITIES || NEW CONNECTION APPLICATION ||
SECURITY REFUND APPLICATION || SECURITY RATES || CHECK YOUR BILL || SAMPLE BILL CALCULATION ||
CONSUMPTION PATTERN || ELECTRICITY TARIFF RATES || SCHEDULE OF GENERAL AND SERVICE CONNECTION CHARGES